Cool Control · Welding Cell Equipment
Cool Control 2.0
Coolant flow monitoring for robotic weld cells. Cool Control 2.0 watches every flow path in the cell and reports a lost cap or a leak before the water reaches anything that matters — primary cap-off detection in around 300 milliseconds, leak detection in 0.3 to 1.0 seconds. An optional vacuum module retracts the coolant on cap loss, so the cap-change area stays dry.
- Primary cap-off detection in approximately 300 ms
- Leak detection in 0.3 to 1.0 seconds
- Monitors 1 to 20 parallel flow paths from one unit
- Configured through a browser, no proprietary terminal needed
- Optional vacuum module keeps the cap-change area dry
Each system is configured per robot model and application — pricing is quoted per specification.
Technical data
What's included
- Cool Control 2.0 controller
- Flow sensing manifold to the configured number of paths
- Mounting hardware
- Commissioning documentation
- Vacuum module (optional)
Request a quote for this system
Tell us your robot model and application — an engineer takes it from there.
Spares for this system
This system doesn't have matching catalogue spares listed yet — an engineer can identify the right replacement part from a photo or part number. Ask an engineer →
Seen here in service