Cool Control 2.0

Cool Control · Welding Cell Equipment

Cool Control 2.0

Coolant flow monitoring for robotic weld cells. Cool Control 2.0 watches every flow path in the cell and reports a lost cap or a leak before the water reaches anything that matters — primary cap-off detection in around 300 milliseconds, leak detection in 0.3 to 1.0 seconds. An optional vacuum module retracts the coolant on cap loss, so the cap-change area stays dry.

  • Primary cap-off detection in approximately 300 ms
  • Leak detection in 0.3 to 1.0 seconds
  • Monitors 1 to 20 parallel flow paths from one unit
  • Configured through a browser, no proprietary terminal needed
  • Optional vacuum module keeps the cap-change area dry
Engineered for
FANUC KUKA ABB YASKAWA Kawasaki Any other robot brand

Each system is configured per robot model and application — pricing is quoted per specification.

Technical data

Flow sensing Vortex, 6.0–50 LPM (1.5–13 GPM)
Accuracy ±3% of full scale
Cap-off detection Dual, primary and secondary
Flow paths 1 to 20
Coolant temperature 4–110 °C
Protection IP66
Power +24 VDC at 0.75 A
Communication Dual Ethernet ports
Interface Touchscreen and browser-based

What's included

  • Cool Control 2.0 controller
  • Flow sensing manifold to the configured number of paths
  • Mounting hardware
  • Commissioning documentation
  • Vacuum module (optional)

Request a quote for this system

Tell us your robot model and application — an engineer takes it from there.

About you
About the system
About the parts
About the work
About the part
About the installation

Spares for this system

This system doesn't have matching catalogue spares listed yet — an engineer can identify the right replacement part from a photo or part number. Ask an engineer →

Becker protector on corrugated tube, in service on a robot

Seen here in service

Cool Control 2.0 monitoring a multi-gun weld cell

See how we deliver